Bitcoin Timber International Ltd. BVI Reg. 2190032
Investor Data Room Restricted Access
Seed Round 2026 $250K · 10% Equity
Round Closes Jun 15, 2026
Investor Data Room · Restricted

HODL
Vault.

Authorised investors & NDA-verified prospects only.
Enter your access code to proceed to the data room.

Invalid access code. Contact invest@bitcointimber.com for access.
Bitcoin Timber International Ltd. · BVI Reg. 2190032
Request access · Back to Investment
Session B1ACB3BB2026-03-15T01:07:15ZAuthenticated
← Back to Investment
Investor Portal · Data Room · Confidential

Due diligence.
Done right.

All material information for the Bitcoin Timber seed round. Seven sections. 20 documents. Session logged.

Round Progress
$0 / $250,000 · 0%
Round Telemetry
Raise Target
$250,000
Equity Offered
10% of BVI holdco
Pre-Money
$2.5M
Post-Money
$2.75M
Minimum
$5,000
Accepted
USD Wire · BTC on-chain
Close Date
2026-06-15 or when full
Observer Seat
$50,000+
Wire Instructions
Entity
Bitcoin Timber International Ltd.
Jurisdiction
British Virgin Islands
Registration
No. 2190032
BTC on-chain
Contact founder
Wire details
Provided after EOI
Contact
invest@bitcointimber.com
✉ I've Sent Funds →
01
Round Overview
The deal at a glance. Start here.
Available
Pitch Deck — Bitcoin Timber
Full investor deck: problem, solution, market, model, ask. 22 slides.
22 slidesUpdated Mar 2026
View Document →
Available
One-Pager — Seed Round 2026
Single-page summary: thesis, terms, use of funds, team, timeline.
1 pageUpdated Mar 2026
View Document →
Available
Executive Summary
Narrative overview of the opportunity, competitive position, and thesis.
2 pagesUpdated Mar 2026
View Document →
02
Deal Structure
Round terms, use of funds, and the 90-day roadmap.
Available
Round Terms — Seed 2026
$250K raise · 10% equity · $2.5M pre-money · BVI entity · close Jun 15.
2 pagesUpdated Mar 2026
View Document →
Available
Use of Funds Breakdown
Line-item allocation: equipment 56%, site prep 20%, working capital 16%, legal 8%.
1 pageUpdated Mar 2026
View Document →
Available
90-Day Roadmap
First 90 days post-close: procurement, site prep, first revenue milestones.
2 pagesUpdated Mar 2026
View Document →
03
Financial Model
Five-year projections. Three revenue streams. Conservative base case.
Available
Financial Model — 5-Year Projection
Timber, mining, carbon credit revenue. Phased energy costs. Monthly cash flow.
6 tabsUpdated Mar 2026
View Document →
Available
Revenue Model
Three streams: green/KD lumber, Bitcoin mining, carbon credits. Price assumptions.
2 pagesUpdated Mar 2026
View Document →
Available
Cost Structure
OPEX breakdown: supplier logs Y1-2, labour, maintenance, fuel transition to $0.
2 pagesUpdated Mar 2026
View Document →
Available
Cap Table — Pre & Post Money
Current ownership. Post-raise dilution at $2.5M pre-money.
1 pageUpdated Mar 2026
View Document →
Available
Bitcoin Treasury Strategy
HODL policy. Self-custody. Accumulation projections. Bear/base/bull scenarios.
2 pagesUpdated Mar 2026
View Document →
04
Technical Documentation
TimberForge system. Engineering specs. Mining fleet.
Available
TimberForge System — Master Spec
Full system overview: TFR-1, TFK-1, PyroCoil HX-1, ClearPath CF-1, MinerSink ME-1.
6 pagesUpdated Mar 2026
View Document →
Available
TFR-1 Reactor — Engineering Spec
Imbert gasifier. 20 kW. 800–950°C. Masonic Method. PCU sensor array.
4 pagesUpdated Mar 2026
View Document →
Available
TFK-1 Kiln — Engineering Spec
5,000 bf/charge. Forced convection. 40–65°C. Miner heat + gasifier exhaust.
3 pagesUpdated Mar 2026
View Document →
Available
Mining Economics
6× S19 Pro · 660 TH/s · 19.5 kW · $0 energy · Braiins FPPS. Difficulty analysis.
3 pagesUpdated Mar 2026
View Document →
05
Site & Operations
Guyana market context. Site plans. Power flow diagrams.
Available
Guyana Market Overview
43.6% GDP growth. Oil boom. CARICOM access. Timber industry context.
3 pagesUpdated Mar 2026
View Document →
Available
Site Plan — Container Layout
7 containers on 1.5m piers. Sawmill, kiln, miners, gasifier, ops. Interactive SVG.
1 pageUpdated Mar 2026
View Document →
Available
Power Flow Diagram
Energy routing: gasifier → generator → miners → kiln heat recovery. All sources.
1 pageUpdated Mar 2026
View Document →
06
Risk & Governance
Risk register. Mitigation strategies. What could go wrong.
Available
Risk Register
All identified risks: BTC volatility, equipment, regulatory, logistics, key-person. Severity + mitigation.
3 pagesUpdated Mar 2026
View Document →
07
Investor Updates
Progress memos. Sent to all investors and serious prospects.
Available
Update #001 — Mar 2026
Round open. Site survey complete. TFR-1 gasifier design finalised. Equipment procurement initiated.
2 pagesUpdated Mar 2026
View Document →
A Note from the Founder
If you've made it this far, you're looking at this the way I'd want an investor to — with rigour. Every document in this room exists because someone asked a hard question and I wanted a hard answer ready. This isn't a pitch. This is the operating manual for a business that turns waste wood into electricity, electricity into Bitcoin, and Bitcoin into a generational treasury — on land my grandfather worked.

If something is missing, tell me. If something doesn't add up, challenge me. I'd rather lose a cheque than gain an investor who didn't do their homework.
Shane Joseph Anthony
Founder & Operator · Bitcoin Timber
@RebelX_o · invest@bitcointimber.com
Ready to move?
Email directly or go back to the investment terms.