Building in Public

Where We
Stand Today.

This is not a white paper. The land is real, the plan is real, and work has already begun. Every milestone is published here.

Round
Seed Open
Target
$250,000
Close
Jun 15, 2026
Phase
7 of 11
Build Timeline 11 Milestones
2024 Q4 ✓ Complete
Land Rights Confirmed

Family land on the Canje River formally documented. Legal ownership verified. Zero rent, forever. This is the foundation everything else is built on.

2025 Q1 ✓ Complete
Feasibility Study & Equipment Quotes

Biomass gasifier specifications confirmed. ASIC miner pricing locked. Sawmill equipment sourced from regional suppliers. All three revenue streams validated as technically feasible.

2025 Q3 ✓ Complete
Site Assessment & Layout

On-site assessment of the Canje River land completed. Equipment layout planned. Access routes for equipment delivery confirmed. Power distribution mapped.

Jan 2026 ✓ Complete
Technical Research & Engineering

Finalised biomass gasifier specifications after six months of research. Validated phased power deployment strategy: diesel → waste vegetable oil → biomass. Full TimberForge system architecture documented across 25 engineering specifications.

Jan 2026 ✓ Complete
Site Visit Completed

Spent 10 days in Guyana surveying the family land. Confirmed river access, road accessibility, and timber availability. Met with local contractors and equipment suppliers. Land is ready for the operation.

Feb 2026 ✓ Complete
Website & Brand Launched

Published bitcointimber.com with full investor portal, technical documentation, and public progress page. Financial model finalised with five-year projections across all three revenue streams. Investor materials package completed.

2026 Q1–Q2 — Now ⚡ Active
Seed Round Open

Raising $250K at $2.5M pre-money valuation for 10% equity. Funds cover equipment procurement, site preparation, and the first 90 days of operation. Target close: June 15, 2026. First-come, first-served.

2026 Q3 ◎ Post-Funding
Equipment Procurement & Site Prep

Gasifier installation begins. Sawmill assembly. Electrical infrastructure for mining rigs. Shipping containers positioned. 60–90 days to first power generation from close of round.

2026 Q3–Q4 ◎ 90 Days Post-Close
First Revenue

Sawmill operational. Bitcoin miners online. First timber sales to domestic and CARICOM markets. BTC treasury begins accumulating. Operations become self-funding.

2027 Q1 ◎ Roadmap
US Export & Scale

Kiln-dried hardwood enters US export pipeline. Carbon credit application submitted. Mining capacity scales as treasury grows. First kiln-dried batch delivered. Series A planning begins.

2027+ ◎ Long-Term Vision
Expand & Compound

Second gasifier unit. Expanded mining fleet. Additional timber concessions. Bitcoin treasury compounds. The flywheel becomes self-perpetuating.

Build Log

Latest Updates.

Every milestone.
Every decision.
Published here.
2026-02-28
The Round Is Open

Most companies raise money to build something. We already have something. We have the land. Family-owned, Canje River, Guyana — coordinates 6.3700°N 57.5200°W if you […]

Read entry →